Flexicel has received confirmation from Saica that the energy recovery (RDF) tests carried out on our non-hazardous waste code LER 200301 have been successful.
Following technical monitoring initiated last year, the results obtained allow us to move forward towards a more efficient and sustainable waste management model by incorporating this waste stream into energy recovery processes.
This milestone represents:
- An estimated cost reduction of 25% per tonne.
- More than 70% of the non-hazardous waste generated being allocated to energy recovery.
Collections of non-hazardous waste for energy recovery have been underway since the beginning of March.
With this step, Flexicel continues to promote initiatives aligned with the circular economy, optimizing resources and reducing the environmental impact associated with waste management. Discover our ESG approach.